100% owned, on Bureau of Land Management (BLM) land, located in Nevada, USA.
Pre-Feasibility Study (PFS) published in June 2026; full announcement available here and presentation available here.
PFS highlights include:
Mineral Reserve Statement: Probable Reserves total 11.8 Mt containing 20,275 of WO3 at 0.171% WO3 and 3.5 Moz of silver*
Mineral Resource Estimate: Indicated total of 12.1 Mt containing 21,600 tonnes of WO3 at 0.178% WO3 with 3.9 Moz silver*
*See below for details on Resources and Reserves
The Resources are derived from Desert Scheelite and Garnet Zones. Tremor, Good Hope, and Gunmetal Zones, alongside others, provide multiple paths for resource growth. Several drill sites are now permitted with drilling planned in Q4 2026.
The PFS results, published in June 2026, indicate that utilizing a conventional open-pit mining method and base case tungsten pricing*, the Pilot Mountain is planned to produce 15,916 tonnes of WO3 over an 8-year mine life, generating after-tax free cash flow of US$1.058 billion, with a capital payback period of 1 year from first commercial production.
On an after-tax basis at base case tungsten pricing*, this translates to a NPV8 of US$660.3 million at an 8% discount rate and an IRR of 59.6%. At the 12 June 2026 tungsten spot price, the project would generate after-tax FCF of US$2.088 billion, with an IRR of 101.6%, an NPV8 of US$1.366 billion and a capital payback of six months from first commercial production.
The PFS was completed in accordance with S-K 1300 standards by a team of U.S.-based specialist firms, led by Samuel Engineering, Inc. of Denver, Colorado and RESPEC Company LLC (RESPEC) of Reno, Nevada.
The Study utilizes conventional open-pit mining and processing methods, with mine design incorporating environmental protection measures across all phases of construction, operations, and closure. Grid power connection is anticipated via a potential self-build powerline option, with water supply to be sourced from wells, subject to receipt of the required water rights.
Combined production from two concurrent open pits is estimated at 15,916 tonnes of WO₃ in concentrate over the mine life, with a life-of-mine stripping ratio of 12.6, a head grade of 0.171% WO₃, and tungsten recovery from milling and flotation estimated at 78.5%. Mining will utilize 92-tonne haul trucks, with both contractor and owner fleet options evaluated in the PFS. The base case assumes a contractor mining model with an owner's team management structure.
Initial mining of the Desert Scheelite pit will facilitate construction of a modern, zero discharge lined tailings storage facility with a rock embankment. Processing infrastructure will comprise primary and secondary crushing, a two-stage grinding circuit, and a flotation recovery plant. Tungsten will be recovered using an industry-standard fatty acid flotation circuit, with sulfide minerals, including silver, recovered ahead of the tungsten recovery stage. Silver will be produced as part of a base metal concentrate and marketed separately from the primary tungsten product.
*Base case utilizes a tungsten price of US$197,300 per tonne of WO3, representing a ~35% discount to the mid-price for ammonium paratungstate (APT) as quoted by Fastmarkets MB-W-0001 of US$304,000 per tonne of WO3 as of 12 June 2026. The mid-price as of 26 June 2026 was US$307,500 per tonne of WO3. All prices are for APT with the study assuming a payable factor of 82% for tungsten concentrate.

Pilot Mountain hosts an updated pit-constrained Mineral Resource Estimate covering the Desert Scheelite and Garnet deposits, with Indicated Resources of 12.1 million tonnes at 0.178% WO3 (containing 21,600 tonnes of WO3) and Inferred Resources of 2.3 million tonnes at 0.150% WO3 (containing 3,400 tonnes of WO3), with silver and zinc credits. Probable Mineral Reserves total 11.8 million tonnes at 0.171% WO3, containing 20,275 tonnes of WO3 and 3.5 million ounces of silver.
Exploration drilling is ongoing at the recently discovered Tremor Zone, alongside further work at the Gunmetal and Good Hope targets, all of which offer meaningful potential to extend the mine life beyond the current 8-year plan.
The Mineral Reserve and Mineral Resource estimates summarized below are derived from the PFS. The supporting technical analyses, assumptions, and disclosures relating to such estimates are expected to be included in a forthcoming Technical Report Summary being prepared in accordance with S-K 1300.
Probable Reserves total 11.8 million tonnes containing 20,275 tonnes of WO3 and 3.5 million ounces silver as detailed below:

Mineral Reserve Statement Notes:
Mineral Resources are reported inclusive of Mineral Reserves. Indicated total 12.1 million tonnes containing 21,600 tonnes of WO3 and 3.9 million ounces silver as detailed below:

Mineral Resource Estimate Notes: